From the monitor tab the HCC1954 (pair) analysis is marked with a red ! and "Done". (see attachments please!)
Drilling down reveals an "Unknown" status.
Further examination into the workflow and the tasks shows nothing but green checkmarks on them!
This is very confusing because of inconsistencies. there are red "!" marks, unknown status reported, then done status reported (along with "!") but then examination of the tasks and workflow shows green checkmarks!
Is there something wrong? If so, where?
-eddie